01 — Chemicals distribution, near Hanau

Situation
Order intake was fax and PDF into a shared inbox. Four large buyers had asked for EDIFACT, and two had begun charging a fee per manual order.
What we did
ORDERS D96A inbound from all four, ORDRSP and INVOIC outbound, mapped against a mid-market ERP that had never spoken EDIFACT. Two of the buyers' specifications disagreed with their own test systems; we worked that through with their EDI teams before go-live rather than after.
What runs now
Twelve message flows, nightly and on demand. An order reaches the ERP within minutes of arrival, and the manual-order fees stopped.

02 — Air cargo handling, Rhein-Main

Situation
A handling system exchanged flat files with two forwarders over a shared network drive. Files vanished when both sides wrote at once, and nobody could say whether a missing consignment was never sent or never read.
What we did
Moved both exchanges onto SFTP with separate inbound and outbound directories, added acknowledgement files in each direction, and wrote a nightly reconciliation that compares what left against what was confirmed.
What runs now
Both forwarder links, four times a night and on demand. The reconciliation report lands at 06:10, and a missing file is a line on it rather than a search through a shared drive.

03 — Food wholesale, in the Wetterau

Situation
An ERP changeover with eleven years of IDoc mappings on the old side and a hard licence end date on the calendar.
What we did
Rebuilt the mappings against the new system rather than porting them, because half of them encoded decisions nobody could explain. Six weeks of dual-run with both systems fed and every difference explained on a morning list. Cutover over one weekend, runbook written, way back tested and not needed.
What runs now
The same document flows on the new ERP. The morning list still runs. Most days it is empty.

04 — Fastener manufacturing, in the Odenwald

Situation
Eleven interfaces, no documentation, and the developer who wrote them gone. Nobody could say what would break when a server was next patched.
What we did
An inventory first: every job, schedule, file path and counterparty, read out of code and logs. Then a written specification per interface, monitoring across all of them, and a quarter of read-logging on the three nobody could account for.
What runs now
Eight interfaces, documented and watched by people who can name them. The other three fed nothing and were retired one per month, with a fallback copy held for a year.